Container loading logistics

Real Container Loading Shots – Transparency You Can Trust

From empty container inspection to final seal, every shipment is recorded and verified.

Complete photo documentation of every container loading process
Visual moisture, shock, and pressure protection procedures
Real-time seal number and container number documentation

Container Loading Process

To ensure every shipment arrives safely and meets international standards, Tri-tiger documents each container loading process in detail. Below are the key checkpoints, each supported with real photos for full transparency.

Empty container interior inspection
Inside view of empty container showing clean walls, floor, and ceiling inspection
1

Empty Container Check

Professional Practice

  • Inspect container cleanliness (no dust, residues, or odors)
  • Ensure floorboards are dry, undamaged, and free of oil stains
  • Confirm there are no holes, leaks, or light penetration through container walls
  • Check door seals and locking mechanisms for proper function

Purpose

Prevents contamination, moisture, or structural issues that may damage furniture during long-distance sea transport. This initial inspection ensures your products start their journey in optimal conditions.

Compliance & Professional Standards

Every shipment meets international quality standards with complete documentation and third-party verification available. We understand that compliance isn't just about meeting requirements—it's about protecting your business reputation and ensuring smooth customs clearance.

Complete Documentation Package

Every container comes with comprehensive tracking data for full transparency

Container No.
TCLU1234567
Seal No.
TT240156789
Total Cartons
487 PCS
Gross Weight
24.8 Tons
Desiccants Used
8 × 500g

AQL Sampling Standards

All container loading processes follow Acceptable Quality Level (AQL) inspection standards to ensure consistent quality across every shipment.

  • Pre-loading random sampling inspection
  • Statistical quality control methodology
  • Defect rate monitoring and reporting
  • Continuous process improvement tracking

ISTA Drop Test Certified

Every packaging design passes International Safe Transit Association drop tests, ensuring your furniture arrives in perfect condition regardless of handling during transport.

  • Multi-angle drop test validation
  • Edge and corner impact resistance
  • Vibration and compression testing
  • Real-world shipping simulation

Third-Party Inspection Available

Independent verification you can trust from globally recognized inspection agencies

SGS
TÜV
Bureau Veritas
Intertek
Pre-Shipment Inspection
Independent quality verification before container loading ensures products meet your specifications
Loading Supervision
Third-party witnesses monitor entire loading process and provide detailed inspection reports
Factory Audit Support
Facilitate customer factory audits with internationally recognized inspection agencies
Customs Compliance
All documentation prepared to meet destination country import requirements and customs standards

Loading Documentation Gallery

Every container loading process is fully documented with high-resolution photos and video footage. Browse our extensive gallery to see the professional standards and attention to detail that protect your investment.

2,847
Total Loading Photos
156
Video Documentation
100%
Containers Documented
0
Loading Damages
Get Factory Quote Now